bg

Powering The Future With Renewability, Precision, And Vision.

High-Performance Wind Power for Industrial Demand

Engineered for High Output and Reliability

01

Reliable Wind Infrastructure

Our wind power plant has 3 MW wind turbines with drivetrain and electrical system architecture. These systems are scaled and upgraded to deliver improved reliability, higher performance, and greater energy output compared to earlier-generation models.

Reliable Wind Infrastructure
02

High Capacity, Efficient Performance

The 3 MW turbines increase installed capacity and annual energy production (AEP), and they operate efficiently in Class II and Class III wind conditions. This means that our wind power plant can work in India’s medium-to-low wind sites and power businesses and tech parks across Karnataka.

High Capacity, Efficient Performance
03

Intelligent Monitoring and Optimization

We have integrated the turbines with a connected digital energy ecosystem. With real-time monitoring, predictive insights, and performance optimisation at both unit and site levels, we maximise operational efficiency.

Intelligent Monitoring and Optimization
Jayalakshmi Real Estate Development

With over twelve years of experience in clean energy generation, Jayalakshmi Power delivers solutions built on proven performance and operational reliability. Our clean wind power balances economic efficiency with environmental responsibility.

Alongside wind energy, we integrate solar power to enhance operational sustainability across our tech parks. A 190 kW photovoltaic installation at one of our campuses generates approximately 3,20,000 kWh per year, reducing grid dependency and ensuring cleaner operations.

Jayalakshmi Real Estate Architecture

Frequently asked questions

At Jayalakshmi Group, we believe in creating dynamic environments that are built not just for the present but are thoughtfully designed.

Jayalakshmi Power harnesses wind energy using advanced 3 MW turbines to supply reliable, cost-effective electricity to industries and technology parks in Karnataka.

Our 3 MW turbine platform uses a shared drivetrain and electrical architecture scaled for improved capacity and energy output, and digital infrastructure that enables real-time monitoring, prediction, and optimisation of performance.

Yes. Jayalakshmi Power’s wind energy is typically priced below government utility rates like BESCOM. So, businesses can secure long-term cost savings through inflation-linked contracts.
Our wind turbines are engineered to perform efficiently in Class II and Class III wind regimes, which are common in many parts of India. So, they are suited for reliable generation across medium-to-low wind sites.
Longevity comes from disciplined planning, dependable technology, and a commitment to solutions that remain efficient and responsible over their full lifecycle.
bg

Contact us

M/s Jayalakshmi Exports and Imports Pvt. Ltd. 4, Pamadi Tower, 1st Main, Gandhi Nagar, Bengaluru, Karnataka 560009.
Contact Number +91 8951567555